A parameter sheet lands on the desk. Three lines in it look perfectly fine: one writes milliampere as ma, one spells a protection rating as "IP sixty-eight", and one replaces a certification mark with its Chinese name. The translation reads smoothly, and the client may not notice anything at first. None of those three lines should have been carried over literally. Anyone who has worked on technical material for long knows that the costly places are seldom unfamiliar words; they are the expressions you recognise perfectly well but must not copy across unchanged.

Unit symbols and protection rating codes annotated on a parameter sheet

Three categories are worth setting out here, all of them checkable in public rules: the casing of International System of Units symbols, the IP protection code defined by IEC 60529, and the convention of keeping certification marks in their original form. Sources are listed at the end for verification.

Unit symbols are not abbreviations; the casing carries the meaning

Symbols in the International System of Units (SI) follow strict rules. The lowercase m of the prefix milli combined with the uppercase A for ampere gives mA; writing ma is not a valid symbol. The kilogram is kg, and neither KG nor Kg is correct. The second is s, not sec. The litre has accepted variants in upper and lower case, but a single document must not mix them. These are not typographic preferences: once a unit symbol is written wrongly, the technical meaning of the figure changes. At best the client sends it back; at worst it stops matching the test report.

Another recurring mistake is to treat a symbol as an abbreviation and add a plural, turning 5 kg into 5 kgs, a form the SI does not provide for. When a Chinese draft uses two expressions for the same unit — "five kilograms" in one place and "5 kg" in another — the translator should first settle on one and then decide which symbol the target market prefers. Our job is not to alter the client's technical parameters but to flag inconsistencies and ask. The parameter belongs to the client; the way it is written belongs to us, and that line is worth keeping.

Protection codes and certification marks: copy the code, do not translate the name

The protection rating comes from IEC 60529 and is written as the letters IP followed by two digits, for example IP68. The IP here is part of the code, not an abbreviation to be rendered in another language. The two digits refer in order to protection against solid objects and against water; their order cannot be swapped, and they should not be written out as Chinese numerals. The same applies to CE, RoHS and FCC: these are the names of product marks, and formal documents normally keep the original mark rather than translating it into a Chinese phrase and then back again.

The complication is that Chinese drafts often already contain colloquial forms such as lowercase "ip68", "IP six eight", or a loose phrase meaning "complies with European standards". The remedy is to consult the original: copy whatever the test report says, and if it cannot be found, flag the item and ask rather than filling it in from memory. This sort of entry tests neither style nor imagination, only willingness to turn one more page. Once a mark is rendered by meaning instead of kept as a mark, it often becomes something else entirely when the client lays out the artwork.

Function words: standby, sleep and power-saving are not interchangeable

Manuals commonly use several Chinese expressions that correspond to different states in an English document and cannot be swapped at will. Standby normally describes a powered but idle condition; sleep usually involves lower power consumption while preserving the conditions needed to resume; a power-saving mode may be a particular functional setting. When a Chinese draft mixes the three, a literal translation blurs instructions that were originally clear.

Our dull method is to put these function words into the comparison table as well: the Chinese source term on the left, the target-language term in the middle, and a one-sentence description of the state on the right. Where we cannot write that sentence, we go back to ask the client or consult another language version of the same product. It is slow, but it keeps "more or less the same" out of the file. The four-step checklist in our industry piece places these checks at the final stage before delivery.

Numbers and tolerances should not be tidied up

A figure written as 0.05 should not become .05, nor should it be turned into 0.050 merely because that looks neater. The signs in a tolerance such as ±0.1 must survive; the number of significant figures carries meaning in the source and should not be increased or reduced in translation. Recognition software also eats decimal points, hyphens and accent marks in scanned copies, so uncertain items are highlighted and asked about as a batch rather than completed by instinct. A number in a parameter sheet is not rhetoric: change one digit and it becomes a different technical commitment.

A three-column table solves most of it

Gathering the traps of recent years together, the tool that remains is surprisingly plain: a table with three columns. The source wording on the left, the agreed wording in the middle, and the source or reasoning for the decision on the right. Units, model numbers, protection codes, certification marks, function words and number formats all go into the same table; when the table changes, the whole batch is refreshed with it. The work is unglamorous and will never earn praise, but it is far cheaper than sending a correction note afterwards.

The two-page memo in our company piece, copied from questions clients had actually asked, is the same idea seen from a different side: one records how to handle a case, the other records what to write. On delivery day the client will not compliment the elegance of the translation, but if every entry can be traced back to a source, that is the most solid answer we can give. (Sources: the published rules of the SI Brochure, the publicly available IEC 60529 protection-code entries, and the official labelling conventions of the certification marks concerned.)